I was tidying up and sort of looking over things in my workroom and surprise, surprise, I came across this abandoned project! Wow! Does not happen often! It was from two years ago and I think what happened, I was cleaning up for company coming, just put this into a covered bin, and you know, out of sight out of mind.
My inspiration, back at the time, was from my Ireland hiking trip and the beautiful Aran knits found in some shops there. Unfortunately, the majority of them are industrial machine-made versions of the hand knits of yester year, but inspiring nonetheless. I had taken some photos to remind myself and one that stuck most in my mind was this poncho. I liked the simplicity, two rectangles joined in a way to make a triangular cover-up and the neckline could be filled in with another straight strip if needed. I was on it!
I had made this first piece, based on some of the Aran stitch patterns
in my ‘Handbook for Manual Machine Knitters’ (available on amazon.com),
spreading various cables over 48-0-49 sets on the LK150. Looking at it now, I
realize I had a brand-new hem technique to share as well as the rest of the
stuff!
#152 Aran Poncho Hem. Chain cast-on, hand transferred scallop made by multiple transfers, eyelets eliminated and 2X1 mini cable with tuck rib. 12 stitch repeat, side away is right side.
1. Cast-on waste yarn, ravel cord. Mark every 12th needle, starting with #1 right. RC000. CAR. Measure out MC 4X width of ns in work, plus 8-10 inches. Double it over on itself to have 2 strands together. This will make a long-enough double strand for the chain cast-on. Bring ns to D/E.
2. With next size-up latch tool, chain loosely from left to right. Anchor last loop on end needle. Close latches. Single strand, MT+1, knit 2 rows.
3. Using 5-prong tool, transfer as in chart for row 3, starting with #1 right as the centre with 3 stitches together. Fill in empty needles with heel stitch from adjacent stitch. Knit 2 rows. RC004.
4. Using 4-prong tool, transfer as in chart for row 5. Fill in empty needles with heel stitch from adjacent stitch. Knit 2 rows. RC006.
5. Continue as in chart, make mini cables after row 7 and row 11. Continue as in chart to RC012.
6. Leave the tuck rib business until this row – because the stitch drops down and is reformed on every other row, it can be done in one operation, instead of every other row!
7. Remove. Turn. Rehang. K2R. RTR. (This makes a two-row purl border.) RC014. Wrong side facing again, ready for next step!
P.S. thanks for all your encouragement! I still have lots to say and share. Cross your fingers! I’m going to give Blogger another shot…
No comments:
Post a Comment